Economy August 13, 2021 - 8:59 am

Fred’s flotsam shuts down major power plant

Haina, San Cristóbal. – Tons of flotsam pushed by Tropical Storm Fred reached the water intake of the Itabo power plant, forcing unit I to temporarily take out of operation, which contributes 128 MW to the National Electric System and with great risk of having to shut down Unit II, which provides the same amount of megawatts.

Itabo’s plants are an essential part of electrical stability, producing 328 megawatts of electricity on a constant basis. The outage of Itabo I took place with the objective of carrying out cleanup tasks to clear the cooling water intake.

“Every time we have to forcibly remove the units due to the garbage issue, that costs millions of pesos in cost overruns of electricity generation for the country, since the Itabo are the second cheapest units in the system,” Itabo said.

COVID-19

April 6, 2025 - 11:00 am

Malaria on high but other indicators controlled

April 4, 2025 - 10:41 am

Digemaps warns against unapproved weight-loss medications on Dominican market

April 3, 2025 - 3:06 pm

Jake Kheel emphasizes the need for ongoing sargassum monitoring

April 2, 2025 - 10:42 am

Urgent reform needed for Autism support in the Dominican Republic

MOST READ

Economy

Leonel Fernández: “The Dollar is soaring, and reserves are shrinking”

Health

Bauta Rojas accuses Agriculture Minister of irresponsibility over swine flu

Health

Urgent reform needed for Autism support in the Dominican Republic

Uncategorized

Public Health detects 183 suspected cases of Severe Acute Respiratory Infection

MORE NEWS

Local

Dominican wounded in Haiti evacuated by Foreign Ministry

Local

President Abinader honored with Fernando Belaunde Terry Medal of Democratic Values

Tourism

Dominican Republic sets record in international air traffic

Local

Tourism Minister backs Abinader’s immigration measures