Economy April 8, 2016 - 11:15 am

Crews link ends of new bridge for Metro Line 2

Santo Domingo.- The ends of the Metro Line bridge over theOzama river have been linked on Friday, while the pouring of the concrete forthe columns advances.

A group of workers are currently busy laying rails on the 800-meterlong bridge for the trains that will ply the Santo Domingo Este-National Districtroute.

The columns of the structure located between the barrio Gualeyand the Los Mina subdivision are higher than that of its neighbor Francisco delRosario Sanchez (La 17), and will be linked with the railway’s 3-kilometertunnel.

The works also advance on the four stations of Line II-Bthat will reach San Vicente de Paul Av. and will pass through several busyintersections in Santo Domingo Este.

COVID-19

May 17, 2024 - 9:22 am

CEMDOE expands services, reinforcing commitment to quality and safety in healthcare

May 16, 2024 - 8:43 am

WHO greenlights Japanese vaccine for Dengue prevention

May 14, 2024 - 10:25 am

Médico Express and Caribbean Health TPA foster medical tourism

May 13, 2024 - 9:34 am

Residents protest thermoelectric vessels in Azua

MOST READ

Local

President Abinader explores semiconductor industry potential with World Bank president

Economy

The 2024 Great Bazaar of Entrepreneurs to elevate business in the Dominican Republic

Economy

CNUS president pushes for monotributo system in the Dominican Republic

Local

After complaints from residents, the SDE Mayor’s Office carries out a cleaning and waste collection day

MORE NEWS

Tourism

Dominican airline breaks passenger transit record

Bavaro & Punta Cana

Trouble in paradise

Economy

Token movement brings trade with Cuba

Economy

Dominican Republic free zones: why they are key and what effect do “tax holidays” generate